Eclipse Companies, LLC
Eclipse Companies, LLC received $57.8M in federal prime contract obligations in the 12 months ending Oct 5, 2026, up 165.5% from $21.8M the year before, and $98.2M since FY2022. Its largest customer is the Department of Transportation.
See 6 contracts ending in the next 18 months ↓Contractor details
- Unique Entity ID (UEI)
- RMCMTCKHMFH9
- CAGE code
- 7UMN9
- Doing business as
- Eclipse Co, LLC of Ohio
- Headquarters
- Chagrin Falls, OH
- Business size
- Small Business
- Socioeconomic status
- WOSB, EDWOSB
As recorded on this UEI's most recent prime contract action in USAspending.gov. Confirm current registration and certifications in SAM.gov.
Obligations by fiscal year
Net prime contract obligations by federal fiscal year.
Markets where it ranks top 10
Agency and NAICS markets where this UEI is one of the ten largest primes in the latest 12 months.
Top agencies
Funding agencies ranked by obligations since FY2022.
| Funding agency | Latest 12 mo | Since FY2022 |
|---|---|---|
| Department of Transportation | $57.8M | $96.3M |
| Corps of Engineers - Civil Works | $0 | $1.7M |
| Department of Agriculture | $0 | $207K |
Top NAICS codes
Industry codes agencies recorded on this contractor's awards, since FY2022.
What it sells
Product and service codes (PSC) on this contractor's awards, since FY2022.
| PSC | Description | Since FY2022 |
|---|---|---|
| Y1LB | Construction of Highways, Roads, Streets, Bridges, and Railways | $96.5M |
| Y1PZ | Construction of Other NON-Building Facilities | $1.7M |
Contracts ending in the next 18 months
This contractor's largest awards whose current period of performance ends soon. Options and extensions often move these dates.
| Award | Agency | Obligated | Current end |
|---|---|---|---|
| 693C7324F00066N | Department of Transportation PROJECT MS ERFO FW HILL 2020-1(1): THE PROJECT CONSISTS OF THE REMOVAL AND RECONSTRUCTION OF TWO BOARDWALKS AND THE REHABILITATION OF ALLIGATOR SLOUGH NATURE TRAIL AND PARKING.… | $2.3M | Apr 30, 2027 |
| 693C7326F00001N | Department of Transportation AR ERFO FS OZSTF810 2022-1(1): THE PROJECT CONSISTS OF THE PERMANENT SLIDE REPAIR OF WHITE ROCK ROAD (NFSR 1003) AND EAST FLY GAP ROAD (NFSR 1503). THE WORK INCLUDES ROADWAY… | $5.7M | May 10, 2027 |
| 693C7326F00012N | Department of Transportation PROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT… | $29.8M | Jun 21, 2027 |
| 693C7326F00006N | Department of Transportation PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE… | $19.0M | Jun 21, 2027 |
| 693C7325F00037N | Department of Transportation PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED… | $3.8M | Jun 30, 2027 |
| 693C7325F00044N | Department of Transportation PROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE… | $2.8M | Oct 31, 2027 |
Recent awards
This contractor's newest prime contract awards, most recent first.
| Award | Agency | Obligated | Awarded |
|---|---|---|---|
| 693C7326F00073N | Department of Transportation PROJECT TN ERFO FS CHRKE804 2021-1(1): THE PROJECT CONSISTS OF REPAIRING STORM AND FLOOD DAMAGE ON HURRICANE GAP ROAD (FS 31). THE SCOPE OF WORK INCLUDES DESIGN SERVICES, SLOPE… | $1.2M | Jul 14, 2026 |
| 693C7326F00036N | Department of Transportation PROJECT AR FW BLD 11(1): THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND RESURFACING OF GRANARY SOUTH ROAD (ROUTE 011). THE WORK INCLUDES BANK STABILIZATION, AGGREGATE BASE… | $2.1M | Feb 26, 2026 |
| 693C7326F00012N | Department of Transportation PROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT… | $29.7M | Dec 17, 2025 |
| 693C7326F00006N | Department of Transportation PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE… | $18.1M | Nov 25, 2025 |
| 693C7326F00001N | Department of Transportation AR ERFO FS OZSTF810 2022-1(1): THE PROJECT CONSISTS OF THE PERMANENT SLIDE REPAIR OF WHITE ROCK ROAD (NFSR 1003) AND EAST FLY GAP ROAD (NFSR 1503). THE WORK INCLUDES ROADWAY… | $5.7M | Oct 10, 2025 |
| 12445225F0055 | Department of Agriculture NRE-2926, DOGE APPROVED 7/15 080109 RHELM CON ROAD MAINTENANCE CONTRACT | $207K | Sep 30, 2025 |
| 693C7325F00119N | Department of Transportation KY NP CUGA BRG(1) THE WORK INCLUDES REPLACING SUPERSTRUCTURE, CLEANING AND PAINTING RUSTED AREAS OF STEEL ARCH ALONG THE FOUNDATIONS, REMOVING FLOOD DEBRIS AND FALLEN TREES,… | $1.1M | Sep 12, 2025 |
| 693C7325F00108N | Department of Transportation KY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY… | $1.6M | Sep 4, 2025 |
Prime contracts (award types A–D) from USAspending.gov through Oct 5, 2026. Subcontracts are not included. Net obligations include deobligations and corrections.

Ready to connect your pursuit work?
GovEagle gives BD directors, capture managers, and proposal teams one AI workspace from pipeline through proposal, with CMMC/FedRAMP Certified compliance built in.