All NASA markets
NAICS 236210 · Industrial Building Construction

Top NASA industrial building construction contractors

In the 12 months ending Oct 5, 2026, the National Aeronautics and Space Administration obligated $596.1M in net prime contract dollars under NAICS 236210, up 64.3% from $362.7M in the preceding 12 months. 17 prime contractors received positive obligations, and 7 of them accounted for 80% of that spend.

Prime contracts funded by the National Aeronautics and Space Administration. Latest 12 months: Oct 6, 2025 to Oct 5, 2026. Source: USAspending.gov.

Net obligations, latest 12 months
$596.1M
up 64.3% vs. $362.7M
Prime contractors
17
With positive obligations
Top 8 primes’ share
85.8%
Of positive obligations
Awards with activity
72
54 in the prior 12 months

Obligations by fiscal year

Net prime contract obligations by federal fiscal year (October to September).

FY2022
$182.5M
FY2023
$390.3M
FY2024
$416.0M
FY2025
$363.0M
FY2026
$596.0M

Top NASA contractors for NAICS 236210

Ranked by positive obligations in the latest 12 months. Share is of all positive obligations in this market.

Top contractors, NASA NAICS 236210
#ContractorLatest 12 moPrior 12 moShareRank change
1Bechtel National, Inc.$191.5M$272.6M32.1%—
2Healtheon, Inc$129.6M$20.2M21.7%▲ 2
3Advon Corporation$35.5M$14.2M6.0%▲ 2
4Sauer Construction, LLC$33.6M$769K5.6%▲ 6
5A & H-Ambica JV LLC$31.5M$21.8M5.3%▼ 2
6Ross Group Construction Corporation, LLC$30.9M$05.2%New
7Hitt Contracting, Inc.$30.3M$05.1%New
8Civil Works Contracting LLC$28.9M$6.2M4.9%▼ 2
9Drace Construction Corp$28.0M$2.5M4.7%—
10Diversified Construction of Oklahoma, Inc.$18.1M$3.6M3.0%▼ 2
11MET-CON, Inc.$12.0M$02.0%New
12Energy EPC Solutions, LLC$11.4M$01.9%New
13Birmingham Industrial Construction, LLC$10.9M$28.4M1.8%▼ 11
14Southeast Cherokee Construction, Inc.$3.5M$566K0.6%▼ 2
15SES Construction and Fuel Services LLC$292K$105K0.1%▼ 2

What changed in the last 12 months

Contractors with the largest change in reported obligations versus the preceding 12 months.

Largest gains

  • Healtheon, Inc
    $20.2M → $129.6M (+$109.4M) · now #2
  • Sauer Construction, LLC
    $769K → $33.6M (+$32.8M) · now #4
  • Ross Group Construction Corporation, LLC
    $0 → $30.9M (+$30.9M) · now #6

Largest declines

  • Bechtel National, Inc.
    $272.6M → $191.5M (−$81.1M) · now #1
  • Birmingham Industrial Construction, LLC
    $28.4M → $10.9M (−$17.5M) · now #13
  • Precision Mechanical Inc
    $3.7M → $0 (−$3.7M) · no latest-period obligations

New to this market

5 contractors received their first obligations in this market (since FY2022) during the latest 12 months. The largest:

New contractors
ContractorFirst obligationLatest 12 mo
Ross Group Construction Corporation, LLCAug 14, 2026$30.9M
Hitt Contracting, Inc.Jun 1, 2026$30.3M
MET-CON, Inc.Sep 24, 2026$12.0M
Energy EPC Solutions, LLCSep 22, 2026$11.4M
BL Harbert International LLCAug 19, 2026$50K

Where the money comes from

Funding sub-agencies within the National Aeronautics and Space Administration, latest 12 months. The funding organization can differ from the office that runs the requirement.

Funding sub-agencies
Funding sub-agencyLatest 12 moPrior 12 moChange
National Aeronautics and Space Administration$596.1M$362.7MUp $233.3M (64.3%)

Potential recompetes

Large awards in this market whose current period of performance ends in the next 18 months. Treat these as research leads: options, extensions, and follow-on vehicles often change the timing.

Awards ending in the next 18 months
AwardIncumbentObligatedCurrent end
80KSC018C0024
Precision Mechanical Inc
FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
$10.7MDec 15, 2026
80KSC024F0066
Diversified Construction of Oklahoma, Inc.
BOOSTER FABRICATION FACILITY (BFF) INTERIORS RENOVATIONS, KENNEDY SPACE CENTER, FLORIDA
$19.6MApr 17, 2027
80MSFC21F0313
A & H-Ambica JV LLC
THIS IS THE SECOND PHASE OF A MULTI-PHASE PROJECT. PHASE 2 CONSISTS OF THE REMOVAL AND REPLACEMENT.OF THE EXISTING ROOFING SYSTEM IN THE NORTHEAST QUADRANT OF BUILDING 103.
$13.7MApr 22, 2027
80JSC022F0258
Healtheon, Inc
CONSTRUCTION OF CENTER FACILITY SUPPORT BUILDING - BUILDING 22
$23.2MJun 7, 2027
80LARC24F0042
Birmingham Industrial Construction, LLC
REPLACE AND REPAIR OF SANITARY SEWER SYSTEMS AT NASA LANGLEY RESEARCH CENTER - PHASE 1.
$9.4MAug 30, 2027
80JSC023F0118
Healtheon, Inc
AVIATION LOGISTICS OPERATIONS FACILITY (ALOF) DESIGN-BUILD
$22.7MSep 11, 2027
80KSC026C0005
MET-CON, Inc.
THE PURPOSE OF THIS CONTRACT IS TO PROVIDE CRAFT LABOR AND CORROSION CONTROL AT JOHN F. KENNEDY SPACE CENTER (KSC), IN SUPPORT OF THE EXPLORATION GROUND SYSTEMS (EGS) PROGRAM.
$12.0MSep 30, 2027
80SSC026F7014
Drace Construction Corp
DESIGN-BUILD (D-B) UPGRADES TO SSC CORE ADMINISTRATIVE BUILDINGS AT STENNIS SPACE CENTER (SSC), MS
$12.5MJan 31, 2028
80KSC020C0013
Sauer Construction, LLC
MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM (SLS) BLOCK 1B, PHASE 1.
$20.8MFeb 29, 2028
80SSC026F7012
Healtheon, Inc
DESIGN-BUILD CONSTRUCTION CONSOLIDATED LABORATORY FACILITY AT STENNIS SPACE CENTER
$33.7MMar 9, 2028

Common questions

Who are the top NASA contractors for NAICS 236210?

In the latest 12 months, Bechtel National, Inc. ($191.5M), Healtheon, Inc ($129.6M), Advon Corporation ($35.5M) received the most NASA obligations for industrial building construction.

How concentrated is this market?

The eight largest primes held 85.8% of positive obligations, and Bechtel National, Inc. alone held 32.1%. 5 contractors won their first obligations in this market during the latest 12 months.

Are any large NASA NAICS 236210 contracts ending soon?

10 of the largest awards in this market reach their current end date in the next 18 months. The first is 80KSC018C0024 (Precision Mechanical Inc, $10.7M obligated), ending Dec 15, 2026. An end date is a research lead, not a confirmed recompete: options and extensions often move it.

Related markets

Figures are net obligations on prime contracts (award types A–D) from USAspending.gov, grouped by funding agency and the NAICS code on each award. Net obligations include deobligations and corrections, so they can differ from positive-obligation totals. See methodology.

Ready to win more?

Ready to connect your pursuit work?

GovEagle gives BD directors, capture managers, and proposal teams one AI workspace from pipeline through proposal, with CMMC/FedRAMP Certified compliance built in.