Top NASA other aircraft parts and auxiliary equipment manufacturing contractors
In the 12 months ending Oct 5, 2026, the National Aeronautics and Space Administration obligated $11.0M in net prime contract dollars under NAICS 336413, up 150.8% from $4.4M in the preceding 12 months. 37 prime contractors received positive obligations, and 7 of them accounted for 80% of that spend.
Prime contracts funded by the National Aeronautics and Space Administration. Latest 12 months: Oct 6, 2025 to Oct 5, 2026. Source: USAspending.gov.
Obligations by fiscal year
Net prime contract obligations by federal fiscal year (October to September).
Top NASA contractors for NAICS 336413
Ranked by positive obligations in the latest 12 months. Share is of all positive obligations in this market.
| # | Contractor | Latest 12 mo | Prior 12 mo | Share | Rank change |
|---|---|---|---|---|---|
| 1 | Science & Technology Corporation | $3.9M | $3.1M | 35.1% | — |
| 2 | Moog Inc | $1.9M | $0 | 17.3% | New |
| 3 | Avenger Aerospace Solutions Inc | $1.5M | $0 | 13.8% | New |
| 4 | David Clark Company Incorporated | $760K | $0 | 6.9% | New |
| 5 | Ultimate Aviation Solutions Inc | $276K | $0 | 2.5% | New |
| 6 | Sentinel Aerospace, LLC | $275K | $0 | 2.5% | New |
| 7 | MCT Industries, Inc. | $264K | $0 | 2.4% | New |
| 8 | Open Solutions LLC | $227K | $0 | 2.1% | New |
| 9 | Kulite Semiconductor Products Inc | $221K | $266K | 2.0% | ▼ 7 |
| 10 | Curtiss-Wright DS, Inc. | $206K | $2K | 1.9% | ▲ 8 |
| 11 | Mission Systems Orchard Park Inc | $198K | $0 | 1.8% | New |
| 12 | Corporate Jet Support Inc | $186K | $0 | 1.7% | New |
| 13 | Summit Aerospace Inc | $104K | $0 | 0.9% | New |
| 14 | Silver Hawk Air LLC | $99K | $56K | 0.9% | ▼ 6 |
| 15 | Gulfstream Aerospace Corporation | $82K | $62K | 0.7% | ▼ 9 |
What changed in the last 12 months
Contractors with the largest change in reported obligations versus the preceding 12 months.
Largest gains
- Moog Inc$0 → $1.9M (+$1.9M) · now #2
- Avenger Aerospace Solutions Inc$0 → $1.5M (+$1.5M) · now #3
- David Clark Company Incorporated$0 → $760K (+$760K) · now #4
Largest declines
- Standardaero Business Aviation Services, LLC$231K → $0 (−$231K) · no latest-period obligations
- Ensign-Bickford Aerospace & Defense Company$177K → $0 (−$177K) · no latest-period obligations
- Martin-Baker Aircraft Company Limited$127K → $0 (−$127K) · no latest-period obligations
New to this market
23 contractors received their first obligations in this market (since FY2022) during the latest 12 months. The largest:
| Contractor | First obligation | Latest 12 mo |
|---|---|---|
| Moog Inc | Sep 28, 2026 | $1.9M |
| Avenger Aerospace Solutions Inc | Sep 8, 2026 | $1.5M |
| David Clark Company Incorporated | Sep 14, 2026 | $760K |
| Sentinel Aerospace, LLC | Apr 2, 2026 | $275K |
| MCT Industries, Inc. | Sep 21, 2026 | $264K |
| Open Solutions LLC | Jun 2, 2026 | $227K |
| Corporate Jet Support Inc | Apr 16, 2026 | $186K |
| Summit Aerospace Inc | Dec 5, 2025 | $104K |
Where the money comes from
Funding sub-agencies within the National Aeronautics and Space Administration, latest 12 months. The funding organization can differ from the office that runs the requirement.
| Funding sub-agency | Latest 12 mo | Prior 12 mo | Change |
|---|---|---|---|
| National Aeronautics and Space Administration | $11.0M | $4.4M | Up $6.6M (150.8%) |
Potential recompetes
Large awards in this market whose current period of performance ends in the next 18 months. Treat these as research leads: options, extensions, and follow-on vehicles often change the timing.
| Award | Incumbent | Obligated | Current end |
|---|---|---|---|
| 80AFRC26P0009 | Avenger Aerospace Solutions Inc DESIGN, DELIVERY, AND INTEGRATION OF SUBSYSTEM PRODUCTS FOR THE GEOMETRY OPTIMIZATION AND SENSING WITH INTEGRATION AND FLIGHT TEST (GOSWIFT) SYSTEM, CULMINATING IN A FLIGHT TEST… | $1.5M | Aug 20, 2027 |
| 80AFRC26P0012 | Moog Inc FABRICATION AND INSTALLATION OF A 32-CHANNEL CLOSED-LOOP LOAD CONTROL SYSTEM INTEGRATED WITH AN INDEPENDENT CONTROLLED LOAD ABORT SYSTEM (CLAS) USING CONTROLLED LOAD ABORT… | $1.9M | Oct 31, 2027 |
Common questions
Who are the top NASA contractors for NAICS 336413?
In the latest 12 months, Science & Technology Corporation ($3.9M), Moog Inc ($1.9M), Avenger Aerospace Solutions Inc ($1.5M) received the most NASA obligations for other aircraft parts and auxiliary equipment manufacturing.
How concentrated is this market?
The eight largest primes held 82.6% of positive obligations, and Science & Technology Corporation alone held 35.1%. 23 contractors won their first obligations in this market during the latest 12 months.
Are any large NASA NAICS 336413 contracts ending soon?
2 of the largest awards in this market reach their current end date in the next 18 months. The first is 80AFRC26P0009 (Avenger Aerospace Solutions Inc, $1.5M obligated), ending Aug 20, 2027. An end date is a research lead, not a confirmed recompete: options and extensions often move it.
Related markets
NAICS 336413 across all agencies
DoD · NAICS 336413
$15.9BDHS · NAICS 336413
$287.1MFigures are net obligations on prime contracts (award types A–D) from USAspending.gov, grouped by funding agency and the NAICS code on each award. Net obligations include deobligations and corrections, so they can differ from positive-obligation totals. See methodology.

Ready to connect your pursuit work?
GovEagle gives BD directors, capture managers, and proposal teams one AI workspace from pipeline through proposal, with CMMC/FedRAMP Certified compliance built in.